B-4 B. B-5 B. B-6 B. B-7 B. B-8 B. D-1 D. Add page 8 to Favourites. Add page 9 to Favourites. The following safety and equipment symbols are used in this document. Add page 10 to Favourites. Use the device only for its in tended purpose and application.

Ensure that all ground paths are uncompromised for safety purposes du ring device operation and service. Ensure that the control power applied to the device, the AC current, and voltage input match the ratings specified on the relay nameplate.

Do not apply current or voltage in excess of the specified limits. Only qualified personnel are to operate the device. Such personnel must be thoroughly familiar with all safety cautions and warnings in this manual and with applicable country, regional, utility, and plant safety regulations. Hazardous voltages can exist in the power supply and at the device connection to current transformers, voltage transformers, control, and test circuit terminals. Make sure all sources of such voltages are isolated prior to attempting work on the device.

Hazardous voltages can exist when opening the secondary ci rcuits of live current transformers. Make sure that current transformer secondary circuits are shorted out before making or removing any connection to the current transformer CT input terminals of the device. When the device is used to control primary equipment, such as circuit breakers, isolators, and other switching apparatus, all control circuits from the de vice to the primary equipment must be isolated while personnel are working on or around this primary equipment to prevent any inadverte nt command from this device.

Uses an external disconnect to isolate the mains voltage supply. Class 1M devices are considered safe to the unaided eye. Vn rotated this angle points the semi plane that corresponds to a Reverse fault. Page Negative Sequence Current [0. Page Voltage Elements These units can also be set as inverse time curves.

Page In case this setpoint is enabled, the undervoltage element will be supervised by the breaker status. Otherwise, the element will operate independently of the breaker status. Page If the voltage input is set as the voltage measured by the 4 voltage transformer, then the metered value will be applied directly to the algorithm. This voltage can be taken through a grounding resistance, a high impedance grounding, a busbar voltage etc.

Page Power 52B type contact. The purpose of this setpoint is to avoid spurious trips caused by overloads after the breaker closure. Page This setpoint specifies the relay characteristic angle RCA for the directional power unit. This setpoint provides ability to respond to the function in any direction defined active forward power, active low forward power, etc. Page Stage 1 is used for alarm functions, while Stage 2 is used for tripping functions.

Events: This setpoint enables or disables the generation of events. All states in this function are affected by this setpoint. For more detail information go to section 5. Page [0. Page This is why F is not suitable for one and a half breaker configurations, or ring configurations where a transmission line or feeder has two breakers. Page Breaker Closing time Time : Estimated breaker Closing time, used for establishing the Closing order in a moment that allows the busbar and line voltages to be in phase.

Page In order to establish the closing permission signal, the first parameter used by the algorithm is the difference in magnitude between line and bus voltages, and afterwards, the angle difference and frequency slip are verified.

Page The main benefit is that after a considerable number of breaker operations, damage to internal connection elements, as well as to the chamber isolating element is drastically reduced, ensuring a longer life for the breaker, and reducing costly maintenance operations. Page is entered, the relay will produce a closing permission output, if it is guaranteed that the projected phasor will be within the limit marked by the setpoint, as shown in the following figure.

Page Cond. Permission setpoint is enabled. In the default factory configuration, the conditions input is associated to the synchronism check element close permission. Page Unblock pulse in case of block by pulse , the block status is abandoned and the autoreclose returns to the Lockout status.

Configurable signals to block the autorecloser are described in section 5. Page 2nd step time delay 2 Step Delay : Time delay applied to the breaker failure second step. No current unit time delay No Current Delay : Time delay applied to the trip without current unit. Reset time Reset Delay : Reset time of the Protection element. Page The unit will pickup if at least one of the three phase currents are above the adjusted level. The operation value will be the higher of the three.

Page Mixed, 16 digital inputs: CC1…. CC16 Supervision: 8 digital inputs: CC1, Page This is not a grouped setpoint; there is a different setpoint for each input.

It is important to distinguish between this delay input time and the debounce time used for filtering undesired transients in the input signal. The Debounce time is always added to the delay input time. Figure 5—shows the types of signals associated to the different output configuration types. The second group, symmetrical and identical to the first, is formed by isolated voltage inputs FF16 and FF Using voltage detectors and current sensing, it is possible to implement several trip or close circuit supervision schemes, as well as protection of the unit output contact.

Page In order to assure a high isolation level between groups, the digital inputs for supervision have been located in a symmetrical basis. That is to optimize the isolation between groups that can be connected to different batteries, and therefore requiring a greater distance between circuits. Page This is a very frequent common case, and we must only wire the tripping circuit to terminals F35 and F36, leaving unused terminals F34, F15, F16, F17, F This latching or memory function is only guaranteed while the unit is powered.

Page terminals F35 and F36 , or be provided by another protection or by the parallel of several protections. This provides high flexibility in the use of this circuit. The battery voltage can also be monitored, by using one of the standard digital inputs.

Page 2mA. Page Virtual Inputs. Logic 0. An ID may be assigned to each virtual output. Virtual outputs are resolved in each pass through the evaluation of the logic equations.

For more detail information see chapters 5. Page Force Io —Input Testing In order to refresh the real status of outputs, according to the information received by the relay processor, the Refresh button must be pressed.

Page OR checkbox for configuring the output operation by activation of any of the indicated signals. The unit performs an OR of the signals, and its output produces operation.

Page Leds This label can replace the original one under the black plastic cover. The label is also provided in word format and can be modified by the user e.

Page Operations If the success signal is received before this period expires, the command signal will be removed and the timer reset. If the success condition is not received within this period of time, the operation is considered to be finished.

Page The object will be blinking during one minute. After that time, the object will be deselected. Front Keys: In operations performed by front keys, the time out for confirmation is 10 seconds. Page Protection Elements OR checkbox to select a group of operands instead of a single one. The relay performs an OR of the signals, and its output produces the operation.

Page This screen is used for the configuration of digital channels and oscillography trigger. Page OR checkbox to select a group of operands instead of a single one. The relay performs an OR of the signals, and its output produces operation. EnerVista Setup: the acknowledged status is shown by a selection mark to the left of the Operation name.

Page The operation bit signal used to launch the opening init must be configured in the operations tab inside relay configuration. Page Hmi Human-Machine Interface This functionality is only applicable to F units with graphical display xpixels , and not for units with alphanumerical display 20x4 characters. Page When the operated object is selected on the screen to execute this operation, the object on which it is located will blink. It is possible to place several operations on the same object, for example to open and close the breaker object.

Page Symbols reserved for future uses Symbol for capacitor banks. Page Please take note of the following remarks: The first equation entered in the PLC can never be a timer Analog elements analog comparators, etc, are not implemented. Page In this case, equation A is the first to be executed. However, in the second case, the first equation to be executed would be B, as its output is before the Equation A output. Page Main Menu The RUN menu includes the following options: Configuration: Not valid in the current application for analog operations still not available Compile: Compiles the configuration functions to generate the equations that will be interpreted by the F PLC.

Page Configuration Generation We must take into account that as the timer is a digital operation that operates as an analog, there must only be a single internal variable or digital input in the timer input.

Page Example Of Application This process will be repeated while the digital input is active. Values for these last 3 fields are reset every time the oscillography settings are modified. Page Signal used to unfreeze the energy counters. Page Time to set a failure in opening the breaker. Page NOTE: If voltage inputs are configured in Delta connection and the auxiliary voltage input is set as Vx, measurement of single phase power value cannot be duly calculated, and therefore, its value will be zero.

For the three-phase power value, the system uses the ARON method, or two-wattmeters method. Page Event Recorder see.

Page The user can either acknowledge all alarms at the same time, or do it partially by selecting the alarms to be acknowledged. Page Fault report file retrieval can be performed via serial or Ethernet communications. It must be taken into account that any settings change in the fault report will produce the removal of all the information stored up to that moment. Data Logger file retrieval can be performed only via Ethernet communications. Page "What is my mother's maiden name?

This question will be posed to the user if the user forgets their password and would like to know what their password was. The first time the enable security option is selected is necessary to close and open EnerVista F Setup to start working under security management. Page In case a user has forgotten about the log in password, the Forgot Password function can be used to retrieve the password.

A question, which is pre-set by the user, will be asked. The password will be retrieved for entering the right answer.

Page Communication Parameters Notice that boot program and firmware upgrades will erase all the data contained in the relay, thus it is advisable to save all the data, oscillography, events, settings and configuration files previously. Backward compatibility of PLC projects, settings and configuration files is not assured for versions older than 1. Page Go to the Control Panel of the computer and select the Network option the name of this option may depend on the PC operative system.

Page Windows allows Multihosting, so it permits having as many directions as desired. It is necessary to turn off and on the computer to activate the new address that has been assigned to the PC.

Page During the upgrade, the system will show the following message indicating the procedure to be followed. Page IP Address that is going to be used lately in the relay for Ethernet connection. Page Until now, no important change has been made to the relay, the boot memory updating process has simply been prepared. The process of flash memory erasing and boot memory file loading can take some minutes, during which a progress bar is displayed.

Page After assigning the Ethernet parameters, the update of the boot memory program has been completed successfully. Page The F equipment includes a mechanism that allows the update of the internal program called firmware, to new versions that are periodically published in the GE Multilin web.

The relay settings and configuration will be lost, so it is advisable to save them to a file. For firmware revisions lower than 1. This Update. This firmware update files can be found in the GE Multilin web site. If the files are downloaded from the web, they are compressed in a zip file. It should be decompressed in a temporary directory from which the update.

This fact does not apply to the firmware upgrade, which can be performed either with the Ethernet fiber connection, or with the cable connection. Page 8. Page Verify that the information shown on the relay front plate corresponds to the data shown on the display, and to the requested relay model.

Display information: Firmware version F X. Page However, if the relay would be calibrated in these conditions, its operational characteristics would be outside the tolerance range values. The following sections detail the list of tests for verifying the complete relay functionality. Page G1 Inp. Page V MIN. V MAX. A computer with EnerVista F Setup software and an appropriate connector must be used.

Apply 50 Vac at 60 Hz on channel Vx. For the next 4 inputs, the setting is Voltage Threshold B. If the relay incorporates more input modules, this test must also be applied to them.

Page Contact Outputs Make circulate a current of mA through the contact in series with the sensing terminal. Send an opening command and verify that the contact does not open. Interrupt current and check than the contact is released.

Repeat the test for the other latched contact FF Page Connect current sources to the relay according to the wiring diagram. Page G Element Configure one of the outputs to be activated only by unit 50G. In this condition, Vn voltage is calculated as a sum of the phase voltages. Page Recloser Statuses Verify that the breaker opens, wait for 8 seconds and verify that the relay does not reclose. Activate the reclose initiation input and open the breaker, verify that the relay executes the first shot GE Multilin F Digital Bay Controller Page - The program will start connection with the relay showing the progress screen.

Page Procedure To Set The Recloser Depending in the application reclosing conditions might come later especially when commands are sent from dispatching center. If does then this timing must be set properly. Press down the rotary knob. Does it support DeviceNet protocol? No it does not support DeviceNet. Q Which functions are available in the relay web server? Currently, it includes several functions for viewing measures and retrieving information.

Page Please select the maximum voltage threshold and debounce time recommended 15 ms to minimize AC coupling effects. Page Why do appear strange texts on the display when switching on the relay?

You will have pressed any button and the HMI has entered in a test mode. The display messages are updated after a few minutes, once the relay has completed the starting sequence. Page I set an output contact as "Latched". If I do not set a "reset" condition, will it reset from the "ESC" key? Page For internet explorer 6. Page The master must know the client address with which it is going to communicate.

No unit will operate after a master request if the message address is not its own, except it the address is 0, which is the broadcast address. Page Auxiliary Table. In this table we can find the corresponding chain, which must be shown for each value. In the memory, only an integer value will be received. Page if it is lower than , this indicates that it is the last message. Page F start up. Page 28 bytes to events and , given that there are only two new events from the last time that they were requested.

Page B. Page NOTE: Only single data can be set in the map, data that are in the memory map and can be read. This feature is not valid for events, waveform records, etc. Page This way, any request or mechanism to obtain information from the relay, can be viewed string by string.

There is another tool for tracing the relay memory: in F menu: Communication, Troubleshooting, any reading to any address can be requested, the PC will form the string together with check-sum register.

Whenever power is removed and re-applied to the F, the default deadbands will be in effect. Page Otherwise, static object requests sent with qualifiers 00, 01, 06, 07, or 08, will be responded with qualifiers 00 or 01 for change-event objects, qualifiers 17 or 28 are always responded.

Note 3: Cold restarts are implemented the same as warm restarts — The F is not restarted, but the DNP process is restarted. Page Change Event Scan Rate: defaults to ms. Page D. Answers to clients request or can send spontaneous Transmission. F implementation of provides analog meterings and states. Actually, it is a TCP communication. The default port is the The F is listening as a server.

Only one client is attended at time. Page 1 ASDU for single point information in the time the event is produced points in user map. These complex signals Virtual Outputs can be assigned to the binary points in the Control Events configuration for the IEC user map.

Page The date in the answer is the same as the received in the command. Page E. Page 1 Deg [25 : 90] Line length Line Length Page 2. Page Pickup level for stage 2 Stage 2 Tap Page [ Page 01,…. Page F. Page The main screen offers the possibility to select the initial logo, a simplified Metering screen showing primary values, or both.

Snapshot Events: Possibility of viewing snapshot events from the relay display in models without graphical display. Page VN as auxiliary voltage input. Page 24 months from date of shipment from factory. In the event of a failure covered by warranty, GE Multilin will undertake to repair or replace the relay providing the warrantor determined that it is defective and it is returned with all transportation charges prepaid to an authorized service center or the factory.

Print page 1 Print document pages. Rename the bookmark. Delete bookmark? Cancel Delete. Delete from my manuals? Sign In OR. Don't have an account?